Timeframe: August 2019–February 2020
The aim of this project is:
Scope of Work:
Timeframe: March 2021–September 2021
The aims of this job are to do review survey of the geological and geotechnical condition, including engineering geology and hazard assessment to definite border area and to process the result of the survey’s data and presenting into geological hazard map for depth 0-100 metre.
The purpose of this job is to get detail potential hazard condition of the area surface, actual and accurate that can fulfill the needs of the plan and construction activity in the digital map.
Scope of Work:
Timeframe: October 2022–2023
Purpose of Study:
Scope of Work:
Timeframe: 10 Weeks (~3 Months)
Purpose of Study:
To discover the area of the polluted area and the amount of polluted soil in the former Kemanng SP area and the former heater location (Simpang Pulai).
Scope of Work:
Timeframe: 30 Weeks (~8 Months)
Purpose of Study:
Scope of Work:
Timeframe: May 2020–February 2021
Purpose of Study:
Scope of Work:
Timeframe: June 2020–July 2021
Purpose of Study:
The Tuban East Java Block is one of the active blocks owned by Pertamina Hulu Energi through its subsidiary PHE Tuban East Java which is currently actively carrying out exploration activities in the North East Java Basin.
One of the main targets in exploration activities within the Tuban block is the Ngimbang Formation syn-rift play, the Kujung Carbonate play and the Ngrayong Formation clastic play.
Scope of Work:
Timeframe: May 2020–June 2021
The aim of this project is:
Scope of Work: